> WS LTD PLANT IN EL GOUNA (EGYPT)
Since June 2010 the first WS LTD plant is in operation. The plant is designed for a thermal input power of 7 MW and has a water production capacity of 500 m3 per day. The plant is operated with two cascades.
Location of the plant on Google Maps or Google Earth.
| Specific values | ||
|---|---|---|
| Distillate production | (m3/h) (m3/d) |
20 500 |
| Salinity | (ppm) | <31 |
| Thermal energy consumption | (kWth) | 7'000 |






